Transition to Triumph Indian Navy 1965 1975



Transition to Triumph: Indian Navy 1965: 1975 By Vice Adm G. M. Hiranandani
2012 | 415 Pages | ISBN: 1897829698 | PDF | 3 MB
This volume of the history of the Indian navy covers the period from 1965 to 1975. Several major developments occurred during this decade. The latest design of the Royal Navy’s Leander class frigates started being produced in Mazagon Docks in India with British collaboration. The first submarine arrived in 1968, and by 1975, the Submarine Arm had grown to eight submarines. The Air Arm was augmented by additional Seahawks, Alizes, and the latest British SeaKing antisubmarine helicopters equipped with dunking sonar. Along with the induction of modern fire-control systems in ships, submarines, and aircraft, the navy acquired its first guided missiles and homing torpedoes.

Buy Premium From My Links To Get Resumable Support,Max Speed & Support Me

Download From 1DL
DOWNLOAD FROM 1DL.NET

DOWNLOAD FROM RAPIDGATOR.NET

DOWNLOAD FROM NITROFLARE.COM

DOWNLOAD FROM UPLOADGIG.COM

Links are Interchangeable – No Password – Single Extraction